Task |
Frequency |
|
---|---|---|
Check and evaluate the system: design, construction, connection... |
Immediately after the contract comes into effect |
|
Adjust and fix the system (if any): design, construction, connection... |
According to actual requirements |
|
Monitoring and warning when there is a problem; Trouble shooting support |
Respond within 48 hours after receiving a notification from the app, or a problem call from a customer |
|
Monthly production report |
Monthly |
|
Annual system performance evaluation report. (Evaluation will be based on the analysis of energy data from the software provided by the contractor compared to the actual electricity generated by the system) |
Annual |
|
Training security personnel on unusual incident response. |
Once and document support for later or new personnel. |
Task |
Frequency |
|
Maintenance and maintenance of the inverter (Inverter) |
Quarterly |
|
Clean the inverter, filter and cooling system… |
|
|
Scan for thermal overload and tighten screws at connection points. |
|
|
Module test |
Quarterly |
|
Check rail system connections and clamps |
|
|
Check the position of the connection points of the modules |
|
|
Visually check the module |
|
|
AC cabinet maintenance (clean, check for thermal overload and tighten connections) |
Quarterly |
|
Check system grounding |
Annual |
|
Measure earth resistance, inverter insulation resistance, AC cabinet. |
Annual |
|
Check, tighten loose bolts, screws or replace, repaint. |
Annual |
|
Trouble shooting support |
|
|
The problem is small and can be handled remotely |
Within 48 hours |
|
Incidents that need to be checked and handled at the construction site |
Within 72 hours |
|
Repair, warranty, replacement of materials - equipment |
|
|
repair and replacement - small spare parts (available spare parts) |
Within 48 hours |
|
Major repair and replacement |
According to actual requirements |
Task |
Frequency |
|
Check the cleanliness and conduct cleaning of the Module with specialized equipment and Polywater® SPW™ battery washing solution imported from the US, safe for aluminum rail systems, (depending on the environmental conditions of the project area, at least 4 times/year) |
Quarterly |
|
Install radiation sensors at sites and panel temperatures, calculate and compare with actual performance. |
Once |
|
Thermal scanning of the entire module system. (thermal overload control panel, battery cell error ...) |
According to actual requirements |